CFD Simulation for LEED Design of Two-Story Multipurpose Building

CFD Simulation for LEED Design of Two-Story Multipurpose Building
Analysis: 
CFD

The objective of this analysis was to develop a realistic computational fluid dynamics (CFD) model of the Parks RFTA Army Reserve building (a large, two-story multipurpose building) under winter and summer operating conditions. The client wanted to leverage our CFD consulting expertize to verify the novel LEED design prior to construction. This required that the CFD simulation to capture the air flow and temperature distribution throughout the building under summer and winter conditions.

What made this building special was the fact that heating, cooling and ventilation where driven by natural convection. This building was designed around a LEED passive energy system. The large concrete dividing wall was exposed to a south facing atrium. The sunlight would pass through the atrium windows, heat the concrete wall and the natural convections would drive air currents through the building. As hot air escaped through the vents at the top of the atrium, cool air was pulled in through the vents on ground level. This green energy concept was verified using CFD simulation results. Interesting enough, the thermal plume from this atrium created sufficiently strong convective currents within the office environments to lower the standard effective temperature (SET). This improved thermal comfort index demonstrated several of the benefits of the LEED construction technique used in the multipurpose two story building.

The CFD simulation results from this analysis provided the client with temperature, air velocity, and flow path throughout the building. This analysis demonstrated that the LEED passive energy design would be effective and if implemented in combination with other energy saving techniques, the building could achieve net zero energy consumption. As CFD consultants, this project represents just one of many similar efforts we have done to manage energy in large buildings with successful results. If this subject is of interest, the reader may look at:

http://www.predictiveengineering.com/consulting/cfd/large-manufacturing-facility-hvac-analysis and http://www.predictiveengineering.com/consulting/cfd/hvac-cfd-modeling-large-power-plant-buildings

 

 

CAD Geometry of the LEED designed multipurpose building used as the starting point for the CFD simulation model

Figure 1: CAD Geometry of the LEED designed multipurpose building used as the starting point for the CFD simulation model

The CFD simulation model with inlets and outlets at windows and vents

Figure 2:  The CFD simulation model with inlets and outlets at windows and vents.

The walls and roofs have been removed and heat transfer to the surrounding air is captured by adjusting the heat transfer coefficient to account for the R-value of the insulation. Wind effects were also incorporated into the model by calculating the appropriate film coefficient for winter and summer conditions.

Air flow velocity traces were made throughout the building via section-cuts

Figure 3:  Air flow velocity traces were made throughout the building via section-cuts.

As the hot air exits the atrium, cool air is drawn in from the outside through the lower level windows and vents. This simulation results was of particular importance to the client since it demonstrated the ability of the LEED design to achieve a lower SET factor via a strong air current within the office environment.

CFD simulation results showing the temperature gradient within the office environment

Figure 4:  CFD simulation results showing the temperature gradient within the office environment

Acceptable temperature levels were achieved using the LEED design and the client was able to get acceptance from the owner of the building to move forward with construction.

Our Partners

Siemens PLM Software
Livermore Software Technology Corporation
Applied CAx
Sherpa Design